CCNP 350-401 ENCOR Question 514 DISCUSSION

  • 866 views
  • 2023-07-05
« Back to Main Menu

A network engineer is adding an additional 10Gbps link to an existing 2x10 Gbps LACP-based LAG to augment its capacity. Network standards require a bundle interface to be taken out of service if one of its member links goes down, and the new link must be added with minimal impact to the production network. Drag and drop the tasks that the engineer must perform from the left into the sequence on the right. Not all options are used.

Q514

Q514

Step 1: Validate the physical and data link layers of the 10Gbps link

Step 2: Execute the channel-group number mode active command to add the 10Gbps link to the exiting group

Step 3: Execute the lacp min-bundle 3 command to set the minimum number of ports threshold

Step 4: Validate the network layer of the 10Gbps link

Support AceITCert.com by buying stuff you need!

0 Comments

In order to participate in the comments you need to be logged-in.
You can sign-up or login (it's free).