CCNP 350-401 ENCOR Question 368 DISCUSSION
« Back to Main MenuRefer to the exhibit. The connection between SW1 and SW2 is not operational. Which two actions resolve the issue?
A. configure switchport nonegotiate on SW1
B. configure switchport nonegotiate on SW2
C. configure switchport mode trunk on SW2
D. condigure switchport mode dynamic desirable on SW2
E. configure switchport mode access on SW2
Refer to the exhibit. The connection between SW1 and SW2 is not operational. Which two actions resolve the issue?
A. configure switchport nonegotiate on SW1
B. configure switchport nonegotiate on SW2
C. configure switchport mode trunk on SW2
D. condigure switchport mode dynamic desirable on SW2
E. configure switchport mode access on SW2
Correct Answer: CD